Skip to content

LU2-WP07 - Existing route maturity and targeted V&V

WP07 closes the maturity audit for existing public routes. The machine-readable source is qualification/0_2_7/lu2_wp07_maturity_matrix.json; this document is a generated-view-style summary of that record.

Decision

PASS_WITH_LIMITATIONS. No promotion or demotion was made. The audit reused the controlled WP06, WP19 and WP20 evidence and reran the focused validation set. No new external campaign was needed because the remaining external correlations are bounded and do not change a public maturity decision.

Route boundary

Route Current maturity Decision Main boundary
Linear static QUALIFIED_BOUNDED KEEP Element/material combinations remain separate claims.
Modal QUALIFIED_BOUNDED KEEP Mass, element and first-mode evidence remain bounded.
Buckling QUALIFIED_BOUNDED KEEP HEX8 buckling remains more-evidence-required/not qualified.
Harmonic QUALIFIED_BOUNDED KEEP Family and external coverage remain bounded.
Newmark dynamics QUALIFIED_BOUNDED KEEP Recovery and element coverage are limited to tested routes.
Nonlinear static EXPERIMENTAL KEEP Broad nonlinear, finite-kinematic and coupled routes are not qualified.
Arc-Length EXPERIMENTAL KEEP Continuation evidence is bounded; no general nonlinear claim.
Small-strain J2 QUALIFIED_BOUNDED KEEP TET4/TET10/HEX8/HEX20 only; no universal increment threshold.
Contact QUALIFIED_BOUNDED KEEP Frictionless scope only; friction remains not qualified.
WEDGE6 EXPERIMENTAL KEEP Static remains experimental; modal evidence is separate and bounded.

Existing evidence and adversarial boundary

WP19 contributes 24 predeclared adversarial cases, including 14 expected failures, with fail-closed behavior, deterministic replay and no NaN/Inf. WP20 contributes the four-family small-strain J2 closure, including return mapping, unload/reload, increment characterization, rollback integrity and finite-difference tangent evidence. WP06 defines the recovery boundary and does not claim universal restart or fault tolerance.

The audit therefore keeps the following explicitly outside qualified claims: finite-kinematic J2, coupled nonlinear routes, friction, mixed meshes, HEX8R / SRI / B-bar, WEDGE15, PYRAMID5 and untested large-route recovery.

Tests and provenance

The focused audit set is recorded in the machine-readable matrix. It includes the WP19, WP20, WP06, checkpoint, preflight, registry and G14 coverage tests; the result was 50 passed. No new external run, heavy benchmark, full regression or numerical source change was performed. WP04 remains USER_INTERRUPTED_INCONCLUSIVE and its supervised retry remains independent.